3.9.4.3 Summary Of Issues And Impacts
A summary of all the issues discussed above for the construction and operation
phases is presented in Tables 3.9-3 and 3.9.4.
Table 3.9-3 Construction Phase Impacts on the Marine Environment
Without Mitigation
With Mitigation
Issue/Impact
Risk
Temporal
Spatial
Cert.
Magnitude
Magnitude Environmental
Consequence
Issue 1: Specific Impacts On The Nearshore Environment
Impact 1:Increased
turbidity as a result of
construction
will occur
short-term
localized
probable
severe
slight
low
Impact 2: Increased
noise levels during
construction - biota
will occur
short-term
localized
probable
moderately
severe
slight
low
Impact 3: Loss of
benthic invertebrates
will occur medium-term localized
possible
moderately
severe
slight
low
Impact 4: Impact on fish
likely
short-term
localized
possible
moderately
severe
slight
low
Issue 2: The Effect Of Pipeline Construction On Fishing Activities
Impact 1: Increased
noise levels during
construction - fisheries
will occur
short-term
localized
probable
moderately
severe
slight
low
Impact 2: Reduced
access to traditional
fishing areas
will occur
short-term
localized
probable
slight
slight
low
Impact 3: Increased risk
of fishing boat collisions
with construction
vessels
will occur
short-term
localized
probable
severe
moderately
severe
low
Impact 4: Increased risk
of hydrocarbon spillage
on the gillnet fishery
may occur short-term
localized
possible
moderately
severe
slight
low
Impact 5: Loss of
benthic invertebrates
will occur medium-term localized
possible
moderately
severe
slight
moderate