Environmental Assessment
Volume C-4.1
Slurry Pipeline
Flora
Ambatovy Project
90
January 2006
(i.e., the forested 2 km of the pipeline and within the Mantadia-Zahamena
Conservation Corridor).
4.1.6.6 Conclusions
During construction and operation, a low environmental consequence is predicted
for the introduction and spread of exotic and unwanted plant species. Mitigations
and monitoring proposed include:
•
Implementation of invasive species control program.
•
Monitoring the effectiveness of exotic and unwanted species control
measures.